Infrastructure Works on Site: Execution, Inspection & Acceptance · Module 0
0.5 The road profile: from contract to shop drawing, and checking existing ground levels
Duration: 12:04 · In Arabic, with synced on-screen text
How to read a road profile: grades, vertical curves and design levels, and why actual ground levels are checked against the drawing before filling, with a worked example.
Key idea: Compare actual ground levels with the drawing before any filling.
Follow my official channels
Field explanations on roads, networks, inspection and acceptance.